色欲久久久久久综合网精品-色欲久久久天天天综合-色欲久久久天天天综合网精品-色欲久久久天天天综合影院-色欲男人的天-色欲人妻综合aaaaa毛

Welcome to the official website of Shanghai Industrial Boiler Co., Ltd. / Shanghai Industrial Boiler (Wuxi) Co., Ltd.

Home
TEL:0510-88787772
Application areaEngineering generalcontractor Boiler modificationEquipment installation

Glass industry



The dry quenching technique utilizes a cold inert gas (combusted exhaust gas) to exchange heat with red hot red coke in a dry quenching furnace to cool the red coke. The inert gas that absorbs the heat of the red coke transfers the heat to the dry quenching boiler to generate steam, and the cooled inert gas is then circulated by the circulating fan into the dry extinguishing furnace to cool the red coke. The steam generated by the CDQ boiler is either incorporated into the steam pipe network of the plant or sent to generate electricity. In the reverse movement, the coke is gradually cooled to below 250 ° C, and then discharged by the unloading device at the bottom of the furnace; at the same time, the inert gas (or waste flue gas) is heated to about 800 ° C, passing through the dry quenching ramp After the primary dust collector, the boiler enters the dry quenching boiler; in the boiler, the water is heated by the hot air stream to generate steam, and the gas is cooled to about 200 ° C, and then re-supplied into the dry extinguishing furnace by the circulating fan through the secondary dust removal.
    

 

    
Glass kiln waste heat power generation process flow chart

The dry quenching technique utilizes a cold inert gas (combusted exhaust gas) to exchange heat with red hot red coke in a dry quenching furnace to cool the red coke. The inert gas that absorbs the heat of the red coke transfers the heat to the dry quenching boiler to generate steam, and the cooled inert gas is then circulated by the circulating fan into the dry extinguishing furnace to cool the red coke. The steam generated by the CDQ boiler is either incorporated into the steam pipe network of the plant or sent to generate electricity. In the reverse movement, the coke is gradually cooled to below 250 ° C, and then discharged by the unloading device at the bottom of the furnace; at the same time, the inert gas (or waste flue gas) is heated to about 800 ° C, passing through the dry quenching ramp After the primary dust collector, the boiler enters the dry quenching boiler; in the boiler, the water is heated by the hot air stream to generate steam, and the gas is cooled to about 200 ° C, and then re-supplied into the dry extinguishing furnace by the circulating fan through the secondary dust removal.
2018/08/16 14:44:43 16596

Related documents

Copy right ? 2018 Shanghai Industrial Boiler Co., Ltd.

Record number: Su ICP No. 18041342

主站蜘蛛池模板: 国产精品秀秀视频 | 91视频中文字幕 | 亚洲欧美日本激情四射 | 国产精品免费人成网站酒店 | 欧美www| 欧美538国产视频观看 | 黑人太粗太深了太硬受不了了 | 欧美日韩一区二区三区在线播放 | 91制片厂爱豆传媒入口 | 国产丝袜一区二区三区展示中国传统文化之美 | 国产午夜视频在线观看 | 精品一卡二卡在线观看 | 91日韩精品 | 久色导航 | 国产激情第二页 | 韩国三a级做爰片免费观看 国产福利萌白酱 | 91网站免费观看直播 | 91视频夜夜上综合美女 | 国产日韩精品中文字幕视频一区福利不卡三级 | 白丝受辱 | 91精品国产综合久 | 三级三级三级a级全黄三 | 91精品专区国产在线观看高清 | 欧美日韩在线精品一区二区三区激情综合 | 有B吗国产中文字幕免费视频 | 97se亚洲国产综合自在线观看 | 亚洲国产日韩欧美一区 | 91制片厂果冻传媒京东影业 | 国产精品欧美久 | 中文字幕乱码亚洲∧v日本 91自拍 | 国产精品免费大片一区二区 | 182午夜TV午夜福利免费 | 伴郎狠狠挺进我下面 | 2025国产精品网站 | 国产蜜芽尤物在线一区 | 午夜免费观看黄在线 | 日韩激情一区 | 欧美国产免费 | 欧美日韩国 | 日韩亚洲欧洲美三区中文字幕 | 中日韩产精品1卡二卡三卡 欧美日韩国产高清 |