Engineering generalcontractor

Shanghai industrial boiler is also committed to providing customers with energy conservation and environmental protection boiler project package solution.

Power station boiler EPC package
Shanxi Gaoyi Iron and Steel Co., Ltd. 15MW high temperature and extra high pressure gas power generation project
Unit operation mode:

A 190t/h high-temperature ultra-high pressure gas boiler (blast furnace gas mixed with converter gas) +1 15MW high-temperature ultra-high pressure back pressure steam turbine unit, steam turbine back pressure parameters: 3.9MPa (a), ~ 373 °C. The back pressure of the steam turbine is returned to the boiler reheater, and the steam temperature is raised to 450 ° C and sent to the steam blower of the steel mill.

Fuel fuel:Mixed gas of blast furnace gas and converter gas
Ignition method:Liquefied gas ignition

In principle, the boiler operates at base load, but has variable load peaking capability. The boiler has good adaptability to the sliding pressure operation and the constant pressure operation.

The time from ignition to full load of the boiler meets the following requirements under normal starting conditions:

Cold start (stop more than 72h)6~8 hours

Warm start (stop 10-72h)3~4 hours

Hot start (within 10 hours of shutdown)1.5~2 hours

Temperature adjustment method:The superheated steam is cooled by two-stage water spray; the reheated steam is cooled by a small amount of water spray.

The service life of the boiler is 30 years, and the life of the convective heating surface flushed by the smoke is more than 120,000 hours. The overhaul interval is 5 years.

The project has been put into operation according to the installation, and all the indicators have reached the predetermined requirements.



Boiler modification

Shanghai industrial boilers can be retrofitted by assembling a Seiko retrofitting team, which can be customized according to customer requirements according to local conditions.

With the continuous improvement of national energy policy and environmental protection requirements, Shanghai Industrial Boiler Co., Ltd. and Shanghai Industrial Boiler (Wuxi) Co., Ltd. have carried out in-depth research and development on the transformation of coal-fired boilers.

Shanghai Industrial Boiler Co., Ltd. and Shanghai Industrial Boiler (Wuxi) Co., Ltd. are willing to customize various boiler renovation solutions for the majority of users.
In order to improve the performance of the original boiler and reduce the emission concentration of the boiler, for the country's energy-saving and environmental protection cause to make due contributions.


Equipment installation

The quality of the engineering installation directly determines its effect after being put into use.

×
主站蜘蛛池模板: 国产精品一区二区在线观看99 | 成人亚洲动漫一区二区三区 | 国产精品一区二区尿失禁 | 亚洲国产精品va在线看黑人 | 欧美a级情欲片在线观看免费网站 | 91香蕉国| 国产福利一区二区三区 | 97视频免费在线观看 | 免费黃色三級片国产片 | 又紧又大又爽精品一区二区 | 国产午夜在线 | 91视频直播app | 亚洲有码视频看看 | 91免费观看网站 | 91桃色安卓版app最新版下载1.0.6 | 欧美日韩一区二区三区在线视频 | 亚洲图片小说三级页面 | 午夜福利影院一区二区三区 | 国产日韩欧美在线观看 | 91成人精品视频 | 羞羞影院体验区 | 午夜在线视频91精品 | 91网页版| 97国产在线公开免费观看 | 国产精品欧美v片免费观看 国产精品极品白 | 99re这里只有精品视频这里只有精品 | 国产精品伦子伦免费 | 国产日韩综合精品一区二区三区 | 国产一二三理论片 | 在线观看午夜天堂 | 日韩喷潮 | 亚洲激情 | 一区二三区国产好的精华液 | 国产乱码精品一区二区三区中 | 国产精品视频高清在线播放 | 日韩伦理网站网址 | 欧美日韩一区二区精品视频在线观看 | 蜜桃精品在线 | 亚洲在线a v| 国产精品一二三在线观看 | 在线免费一区 |